
Second-fix & finishing works
The finishing trades that close out a project once the main structure is in place.

Designed around the actual application.
Second fix is everything that goes in after the shell and first-fix services: doors and ironmongery, trims, screens, fittings and the making good around them.
It is the stage where tolerances show, so joints, alignments and finishes are set out and checked before handover.
Final dimensions, materials, fixings and finishes are confirmed for each project before work begins.
What this service can include.
- 01
- Door hanging and ironmongery
- 02
- Trims, thresholds and cover plates
- 03
- Fixtures, fittings and accessories
- 04
- Sealing, adjustment and alignment
- 05
- Snagging and handover
Where this work is typically used.
- 01
Fit-out completion
The exact configuration and project responsibilities are agreed after reviewing the site and design requirements.
- 02
Handover packages
The exact configuration and project responsibilities are agreed after reviewing the site and design requirements.
- 03
Refurbishment
The exact configuration and project responsibilities are agreed after reviewing the site and design requirements.
Useful project information.
Send what you already have. Any missing details can be identified during the discussion.
- 01
Drawings
Plans, elevations, sections or sketches that show the intended work.
- 02
Site photographs
Clear overall and close-up views of the opening, elevation or existing condition.
- 03
Measurements
Available opening sizes, levels and other dimensions relevant to the requested scope.
Also in fit-out & renovation
Need second-fix & finishing works?
Send us the sizes, drawings or a photograph of the site and we will discuss the scope with you.
